Welcome to our site

Unit 6, No.27, Mohana Alley, Taghavi St, Ferdowsi Sq, Tehran, Iran

Shiraz Industrial Refrigeration Monitoring System

Objectives of the project:  

Temperature and Humidity Monitor in warehouse halls.

Online Monitoring in PC.

Log temperature and humidity records. Graph outputs.

Temperature and Humidity Alarm generator.

Geographical location of the project:

Modarres Blv , Shiraz

main contractor:

Pardazesh Tamkar Eng Co.

Project Implementation Activities:

Install Temperature and Humidity Sensors in all locations.

Wiring Sensors to Control  room.

Install Logger rack in control room. Connected to power and sensors.

Test all sensors and calibration.

Install Software and connected to switcher.

Test software and hardware.

Training technical team for use system.

Key layout times:

Date of Contract Entry: April 13,

Date of Contract Entry: June 22, 2006

Production time 20 days

Installation 15 days

Test and training 2 days

Post a comment

Your email address will not be published.